{"id":631,"date":"2026-10-16T21:43:06","date_gmt":"2026-10-16T21:43:06","guid":{"rendered":"https:\/\/aspsuperhome.com\/guides\/?page_id=631"},"modified":"2026-11-04T00:46:30","modified_gmt":"2026-11-04T00:46:30","slug":"boca-raton","status":"publish","type":"page","link":"https:\/\/aspsuperhome.com\/guides\/kitchen-remodeling\/boca-raton\/","title":{"rendered":"Kitchen Remodeling Boca Raton | ASP Superhome"},"content":{"rendered":"\n<div class=\"wp-block-cover alignfull is-dark\" style=\"min-height:460px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-secondary-background-color has-background-dim-60 has-background-dim\"><\/span><img class=\"wp-block-cover__image-background wp-image-629\" alt=\"Homeowner inspecting a newly remodeled kitchen with new cabinets, countertops, backsplash, and appliances in daylight.\" src=\"https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/homeowner-inspecting-a-newly-remodeled-kitchen-with-new-cabi-photo.jpg\" width=\"1376\" height=\"768\" srcset=\"https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/homeowner-inspecting-a-newly-remodeled-kitchen-with-new-cabi-photo-150x150.jpg 150w, https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/homeowner-inspecting-a-newly-remodeled-kitchen-with-new-cabi-photo-300x167.jpg 300w, https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/homeowner-inspecting-a-newly-remodeled-kitchen-with-new-cabi-photo-768x429.jpg 768w, https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/homeowner-inspecting-a-newly-remodeled-kitchen-with-new-cabi-photo-1024x572.jpg 1024w, https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/homeowner-inspecting-a-newly-remodeled-kitchen-with-new-cabi-photo.jpg 1376w\" sizes=\"(max-width: 825px) 825px, 100vw\" fetchpriority=\"high\" decoding=\"async\"\/><div class=\"wp-block-cover__inner-container has-global-padding is-layout-constrained wp-block-cover-is-layout-constrained\">\n<p class=\"chg-eyebrow has-base-color has-text-color wp-block-paragraph\">Kitchen Remodeling | Boca Raton<\/p><h1 class=\"wp-block-heading has-base-color has-text-color\">Kitchen Remodeling in Boca Raton, Planned Around How You Live<\/h1><p class=\"has-base-color has-text-color wp-block-paragraph\" style=\"font-size:clamp(0.875rem, 0.875rem + ((1vw - 0.2rem) * 0.682), 1.25rem);\">Whether you refresh your current kitchen or rebuild it from the studs, start with a clear plan. Book a free first consultation with ASP Superhome.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+17869339815\">Book a Free Consultation<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/aspsuperhome.com\/contact\/\">Book a Free Consultation<\/a><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-base-color has-primary-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-4d466591 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--primary,#20242e);color:var(--wp--preset--color--base,#ffffff);padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center has-base-color has-text-color\">Start With Confidence<\/h2>\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"has-text-align-center wp-block-paragraph\"><span class=\"chg-icon chg-icon--star chg-stat-ico\"><\/span><\/p><h3 class=\"wp-block-heading has-text-align-center chg-stat has-base-color has-text-color\">Free<\/h3><p class=\"has-text-align-center wp-block-paragraph\">First consultation<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"has-text-align-center wp-block-paragraph\"><span class=\"chg-icon chg-icon--shield chg-stat-ico\"><\/span><\/p><h3 class=\"wp-block-heading has-text-align-center chg-stat has-base-color has-text-color\">Confidential<\/h3><p class=\"has-text-align-center wp-block-paragraph\">Your details stay private<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"has-text-align-center wp-block-paragraph\"><span class=\"chg-icon chg-icon--check chg-stat-ico\"><\/span><\/p><h3 class=\"wp-block-heading has-text-align-center chg-stat has-base-color has-text-color\">No obligation<\/h3><p class=\"has-text-align-center wp-block-paragraph\">No commitment to continue<\/p><\/div><\/div>\n\n<\/div>\n\n\n<p class=\"wp-block-paragraph\" style=\"font-size:0.85rem;color:#6b7280;margin-bottom:1.5rem\">By Jonathan Rodriguez \u00b7 Published October 13, 2026<\/p>\n\n<article lang=\"en\">\n\n<h2>Kitchen Remodeling in Boca Raton: Planning a Project for a South Florida Home<\/h2>\n<p>Planning kitchen remodeling in Boca Raton starts with one choice: refresh the room you have, or rebuild it. Both paths can work. The right one depends on what is wrong today and how your household uses the kitchen.<\/p>\n<p>Many homeowners live with a kitchen that works poorly. Cabinets sag, counters stain, and the layout forces extra steps for every meal. Other kitchens look dated but still function. These problems build slowly, so it&#8217;s easy to put off the decision.<\/p>\n<p>Kitchen remodeling usually covers cabinets, countertops, layout, lighting, and appliances. Some projects also move plumbing or electrical lines, which adds planning. The scope you choose sets the timeline and the budget.<\/p>\n<p>ASP Superhome offers kitchen remodeling alongside impact windows, impact doors, metal and tile roofing, roof repair and replacement, solar panels, and <a href=\"https:\/\/www.energy.gov\/eere\/solar\/solar-energy-technologies-office\">solar battery backup<\/a>. If you&#8217;re planning other upgrades too, ask how they fit into the schedule.<\/p>\n<p>Our free first consultation is confidential and carries no obligation to continue. You can ask about scope and budget before you decide anything.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-base-color has-accent-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--accent,#20242e);color:var(--wp--preset--color--base,#ffffff);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-base-color has-text-color\">Not sure what your next step is?<\/h3><p class=\"wp-block-paragraph\">Talk it through with our team &#8212; the first consultation is free, confidential, and carries no obligation.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+17869339815\">Get a free consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/aspsuperhome.com\/contact\/\">Get a free consultation<\/a><\/div><\/div>\n<\/div>\n\n<figure class=\"wp-block-image size-large has-custom-border\"><img decoding=\"async\" src=\"https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/sleek-contemporary-kitchen-with-white-cabinetry-and-stainles-photo-1.jpg\" alt=\"Sleek contemporary kitchen with white cabinetry and stainless steel appliances\" style=\"border-radius:8px;width:100%;aspect-ratio:16\/9;object-fit:cover\"\/><\/figure>\n<h2>What Are the Signs That It&#8217;s Time to Replace Kitchen Cabinets?<\/h2>\n<p>Replacement makes sense when cabinet damage goes past the surface, such as swollen or separating boxes. Surface problems like loose hinges or worn paint usually need less work.<\/p>\n<p>Watch for these signs in your kitchen:<\/p>\n<ul>\n<li>Swelling or peeling laminate at cabinet bases, especially near the sink<\/li>\n<li>Warped doors or drawer fronts that no longer close flush<\/li>\n<li>Soft, stained, or crumbling panels<\/li>\n<li>Finish that bubbles, flakes, or peels away<\/li>\n<\/ul>\n<p>South Florida&#8217;s heat, humidity, and sun speed up this kind of wear. Moist air settles into cabinet bases and lower panels. Direct sun through a window can fade finishes.<\/p>\n<p>Repairs can be enough when the damage is limited to hardware, a few doors, or the surface finish. Replacement is usually the better path when the boxes themselves have failed, when old patch repairs left mismatched cabinets, or when the layout no longer fits how your household cooks and stores food.<\/p>\n<p>The clearest way to tell is an in-home measurement and inspection. Someone looks at the boxes, the base, and the wall behind them. Then they explain which signs apply to your cabinets.<\/p>\n<h2>Is $10,000 Enough for a Kitchen Remodel in Boca Raton?<\/h2>\n<p>Whether $10,000 is enough depends on what you plan to change, not on the number alone. A focused update may fit a smaller budget. A full layout change usually needs more.<\/p>\n<p>A focused update might cover hardware, lighting, or countertops. A bigger project often adds new cabinetry, appliances, and relocated plumbing or electrical. Each added item raises the total. Demolition and finish work add to it too.<\/p>\n<p>Several cost drivers move a budget:<\/p>\n<ul>\n<li>Cabinet grade and materials<\/li>\n<li>Countertop type<\/li>\n<li>Appliance package<\/li>\n<li>Relocated plumbing or electrical<\/li>\n<li>Demolition and finish scope<\/li>\n<\/ul>\n<p>Before you ask for numbers, list your must-haves and nice-to-haves. Note which items you could delay. Then request a written estimate that itemizes each category, so you can see what each line covers.<\/p>\n<p>Exact pricing depends on your home and the scope you choose. We provide it after reviewing your project, not before.<\/p>\n<h2>Cabinets, Countertops, and Layout for Boca Raton Kitchens<\/h2>\n<p>Modern white kitchens with clean lines suit many Boca Raton homes. Their long-term look depends on the materials behind the doors.<\/p>\n<p>Moisture matters. Cabinet boxes and panels that swell when wet fail faster near sinks and dishwashers. Ask about the core material and sealing for each option. For countertops, ask what care each surface needs.<\/p>\n<p>Layout shapes daily use. Consider the path between sink, stove, and refrigerator, island placement, and pantry access. Moving walls or utilities can require permits, which we cover in the next section.<\/p>\n<p>Sharing photos and measurements helps. Send photos of your current kitchen, room measurements, and your must-have list. Options can then be reviewed before you commit to anything.<\/p>\n<h2>Permits, HOA and Condo Approvals, and Coordinating Work in Palm Beach County<\/h2>\n<p>Most kitchen work that changes electrical, plumbing, or structure needs a permit from the local building authority. Florida law says no one may alter or repair a building without first getting a permit from the enforcing agency. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0500-0599\/0553\/Sections\/0553.79.html\">Florida law<\/a>, it is generally unlawful to construct, erect, alter, modify, repair, or demolish a building in this state without first obtaining a permit from the appropriate enforcing agency, unless otherwise provided by law.<\/p>\n<p>Permit offices differ by city and county. For Boca Raton homes, check with the City of Boca Raton Building Division, or the county office if your property falls under county jurisdiction. The enforcing agency can revoke a permit when work does not conform to the Florida Building Code.<\/p>\n<p>Condominium and homeowners&#8217; associations often set their own rules for renovation hours, contractor insurance, and alterations. These rules live in your governing documents and vary by community. Check them before you schedule.<\/p>\n<p>Coordinating permits, inspections, and trades affects the timeline. Ask how the schedule is built and when the kitchen will be out of use. Agencies set their own pace, so we don&#8217;t promise approval dates.<\/p>\n<p>Florida also requires many owners to record a notice of commencement before work starts, with some exceptions. The notice expires one year after recording unless a different date is set. See <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0700-0799\/0713\/Sections\/0713.13.html\">Fla. Stat. \u00a7 713.13<\/a>.<\/p>\n<h2>Can You Remodel a Kitchen Yourself, or Is a Professional Team Better?<\/h2>\n<p>Some kitchen tasks suit a capable homeowner. Electrical, plumbing, gas, and structural work usually need licensed trades and permits.<\/p>\n<p>Painting and hardware swaps are common do-it-yourself tasks. Light fixture swaps may need an electrician, depending on the wiring. Mismatched work can fail inspection, and missed permits can leave work unapproved.<\/p>\n<p>Water is a real risk in South Florida kitchens. Areas near sinks and dishwashers need careful sealing, or moisture can reach floors and walls.<\/p>\n<p>Florida law sets strict conditions for owners who act as their own contractor. The owner must personally sign the permit application and supervise the work. See <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0400-0499\/0489\/Sections\/0489.103.html\">Fla. Stat. \u00a7 489.103<\/a>. Florida law also says contracts made by an unlicensed contractor cannot be enforced by that contractor. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0400-0499\/0489\/Sections\/0489.128.html\">Florida law<\/a>, as a matter of public policy, contracts entered into on or after October 1, 1990, by an unlicensed contractor are unenforceable in law or in equity by that unlicensed contractor.<\/p>\n<p>When you talk with us, ask who will handle permits, inspections, and daily scheduling. One clear point of contact keeps the project organized.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-base-color has-accent-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--accent,#20242e);color:var(--wp--preset--color--base,#ffffff);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-base-color has-text-color\">Not sure what your next step is?<\/h3><p class=\"wp-block-paragraph\">Talk it through with our team &#8212; the first consultation is free, confidential, and carries no obligation.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+17869339815\">Get a free consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/aspsuperhome.com\/contact\/\">Get a free consultation<\/a><\/div><\/div>\n<\/div>\n\n<figure class=\"wp-block-image size-large has-custom-border\"><img decoding=\"async\" src=\"https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/modern-kitchen-with-stainless-steel-appliances-and-wooden-ca-photo.jpg\" alt=\"Modern kitchen with stainless steel appliances and wooden cabinets in a Boca Raton remodel.\" style=\"border-radius:8px;width:100%;aspect-ratio:16\/9;object-fit:cover\"\/><\/figure>\n<h2>From Free Consultation to Installation: What to Expect<\/h2>\n<p>A typical kitchen project moves from consultation to measurement, a written estimate, permits, installation, and a final walkthrough. The timing changes with the scope.<\/p>\n<p>The first consultation is free, confidential, and carries no obligation to continue. Use it to ask about scope, budget, and what permits would require.<\/p>\n<p>Payment timing matters. Under Florida law, a contractor who receives an initial payment above 10 percent of the contract price must apply for permits within 30 days. The contractor must start work within 90 days after permits are issued, unless there is just cause or the owner agrees in writing to more time. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0400-0499\/0489\/Sections\/0489.126.html\">Florida law<\/a>, a contractor who receives initial payment of more than 10 percent of the contract price for residential repair, restoration, improvement, or construction must apply for necessary permits within 30 days after that payment, and start the work within 90 days after the permits are issued, subject to the exceptions stated in the statute.<\/p>\n<p>For a direct owner-contractor contract over $2,500, Florida law requires a construction lien notice in the contract. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0700-0799\/0713\/Sections\/0713.015.html\">Florida law<\/a>, a direct contract greater than $2,500 between an owner and a contractor for improvements to a single or multiple family dwelling of up to four units must contain a construction lien notice printed in no less than 12-point, capitalized, boldfaced type, signed by the owner and dated. Read that notice before you sign.<\/p>\n<h3>Do I need a permit for kitchen remodeling in Boca Raton?<\/h3>\n<p>Usually yes, when the work changes electrical, plumbing, or structure. The local building office sets the process.<\/p>\n<h3>Can I cancel a kitchen remodel contract after I sign?<\/h3>\n<p>The federal Cooling-Off Rule gives buyers three business days to cancel certain sales made away from a seller&#8217;s place of business, under <a href=\"https:\/\/www.ecfr.gov\/on\/2026-10-06\/title-16\/section-429.1\">16 CFR 429.1<\/a>. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0500-0599\/0501\/Sections\/0501.025.html\">Florida law<\/a>, a buyer may cancel a home solicitation sale until midnight of the third business day after the day the buyer signs the agreement or offer to purchase, by giving written notice of cancellation to the seller at the address stated in that agreement.<\/p>\n<h3>How long does a kitchen remodel take in Boca Raton?<\/h3>\n<p>The timeline depends on scope, permits, and materials. A written estimate and schedule give you the clearest picture.<\/p>\n<p>If your Boca Raton kitchen is wearing out and you&#8217;re deciding between a refresh and a full remodel, <a href=\"https:\/\/aspsuperhome.com\/contact\/\">request a quote<\/a> with ASP Superhome today.<\/p>\n\n<\/article>\n<footer class=\"disclaimer\"><em>General information; not a binding estimate until agreed upon by both parties.<\/em><\/footer>\n\n\n<div class=\"wp-block-group alignwide has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">What to Expect When You Plan With Us<\/h2>\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--chat\"><\/span><\/p><h3 class=\"wp-block-heading\">A straightforward conversation<\/h3><p class=\"wp-block-paragraph\">We listen to how your household uses the kitchen today and what frustrates you most about it.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--lightbulb\"><\/span><\/p><h3 class=\"wp-block-heading\">Refresh or rebuild options<\/h3><p class=\"wp-block-paragraph\">We talk through practical paths, from updating what works to reworking the layout where it doesn&#x27;t.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--document\"><\/span><\/p><h3 class=\"wp-block-heading\">A clear quote to review<\/h3><p class=\"wp-block-paragraph\">You receive a written quote to compare against your priorities, with no pressure to decide on the spot.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--heart\"><\/span><\/p><h3 class=\"wp-block-heading\">Attention to a South Florida home<\/h3><p class=\"wp-block-paragraph\">We keep Boca Raton&#x27;s climate, humidity, and storm-ready construction in mind when recommending materials and finishes.<\/p><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group has-base-color has-accent-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--accent,#20242e);color:var(--wp--preset--color--base,#ffffff);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-base-color has-text-color\">Note the Problems Before You Call<\/h3><p class=\"wp-block-paragraph\">Jot down what bothers you most: sagging cabinets, stained counters, poor lighting, or a layout that wastes steps. A short list helps us focus the consultation on what matters to you.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+17869339815\">Start Your Free Consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/aspsuperhome.com\/contact\/\">Start Your Free Consultation<\/a><\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-surface-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">Common Kitchen Remodeling Goals<\/h2>\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Update the look<\/h3><p class=\"wp-block-paragraph\">New cabinet fronts, counters, and hardware can change the feel of a kitchen while keeping the existing footprint.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Improve the layout<\/h3><p class=\"wp-block-paragraph\">Relocating sinks, appliances, or walkways can reduce wasted steps during daily cooking and cleanup.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Upgrade materials<\/h3><p class=\"wp-block-paragraph\">Durable surfaces and finishes suited to South Florida humidity can help a kitchen hold up over time.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Full rebuild<\/h3><p class=\"wp-block-paragraph\">When the room no longer works, a complete remodel lets us redesign storage, workflow, and finishes together.<\/p><\/div><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-base-color has-secondary-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-4d466591 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--secondary,#20242e);color:var(--wp--preset--color--base,#ffffff);padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center has-base-color has-text-color\">Ready to Plan Your Boca Raton Kitchen?<\/h2>\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-0aa01211 wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+17869339815\">Request Your Free Estimate<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/aspsuperhome.com\/contact\/\">Request Your Free Estimate<\/a><\/div><\/div>\n<\/div>\n\n<h2 class=\"wp-block-heading\">Related practice areas<\/h2><ul class=\"wp-block-list\"><li>Metal Roofing Fort Myers: Styles, Cost and Florida Rules<\/li><\/ul>","protected":false},"excerpt":{"rendered":"<p>Planning a kitchen remodel in Boca Raton? Learn the cabinet warning signs, permit rules, and budget factors, then request a quote from ASP Superhome.<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":117,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"chg_review":"{\"v\": 1, \"checked_at\": \"2026-10-13T23:08:50+00:00\", \"checked\": true, \"jurisdiction\": \"Florida\", \"claims\": [{\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0500-0599\/0553\/Sections\/0553.79.html\", \"cite\": \"Fla. Stat. \u00a7 553.79\", \"heading\": \"Permits; applications; issuance; inspections.\", \"support\": \"it shall be unlawful for any person, firm, corporation, or governmental entity to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency\", \"verdict\": \"supported\", \"law_text\": \"(1)(a) Unless otherwise provided by law, after the effective date of the Florida Building Code adopted as herein provided, it shall be unlawful for any person, firm, corporation, or governmental entity to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency or from such persons as may, by appropriate resolution or regulation of the authorized state or local enforcing agency, be delegated authority to issue such permits, upon the payment of such reasonable fees adopted by the enforcing agency. \u2026\", \"sentence\": \"Most kitchen work that changes electrical, plumbing, or structure needs a permit from the local building authority.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0500-0599\/0553\/Sections\/0553.79.html\", \"cite\": \"Fla. Stat. \u00a7 553.79\", \"heading\": \"Permits; applications; issuance; inspections.\", \"support\": \"it shall be unlawful for any person, firm, corporation, or governmental entity to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency\", \"verdict\": \"supported\", \"law_text\": \"(1)(a) Unless otherwise provided by law, after the effective date of the Florida Building Code adopted as herein provided, it shall be unlawful for any person, firm, corporation, or governmental entity to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency or from such persons as may, by appropriate resolution or regulation of the authorized state or local enforcing agency, be delegated authority to issue such permits, upon the payment of such reasonable fees adopted by the enforcing agency. \u2026\", \"sentence\": \"Florida law says no one may alter or repair a building without first getting a permit from the enforcing agency.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0500-0599\/0553\/Sections\/0553.79.html\", \"cite\": \"Fla. Stat. \u00a7 553.79\", \"heading\": \"Permits; applications; issuance; inspections.\", \"support\": \"The enforcing agency is empowered to revoke any such permit upon a determination by the agency that the construction, erection, alteration, modification, repair, or demolition of the building for which the permit was issued is in violation of, or not in conformity with, the provisions of the Florida Building Code.\", \"verdict\": \"supported\", \"law_text\": \"\u2026 The enforcing agency is empowered to revoke any such permit upon a determination by the agency that the construction, erection, alteration, modification, repair, or demolition of the building for which the permit was issued is in violation of, or not in conformity with, the provisions of the Florida Building Code. Whenever a permit required under this section is denied or revoked because the plan, or the construction, erection, alteration, modification, repair, or demolition of a building, is found by the local enforcing agency to be not in compliance \u2026\", \"sentence\": \"The enforcing agency can revoke a permit when work does not conform to the Florida Building Code.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0700-0799\/0713\/Sections\/0713.13.html\", \"cite\": \"Fla. Stat. \u00a7 713.13\", \"heading\": \"Notice of commencement.\", \"support\": \"Except for an improvement that is exempt under s. 713.02(5), an owner or the owner\u2019s authorized agent before actually commencing to improve any real property, or recommencing completion of any improvement after default or abandonment, whether or not a project has a payment bond complying with s. 713.23, shall record a notice of commencement in the clerk\u2019s office\", \"verdict\": \"supported\", \"law_text\": \"(1)(a) Except for an improvement that is exempt under s. 713.02(5), an owner or the owner\u2019s authorized agent before actually commencing to improve any real property, or recommencing completion of any improvement after default or abandonment, whether or not a project has a payment bond complying with s. 713.23, shall record a notice of commencement in the clerk\u2019s office and post either a certified copy thereof or a notarized statement that the notice of commencement has been filed for recording along with a copy thereof. \u2026\", \"sentence\": \"Florida also requires many owners to record a notice of commencement before work starts, with some exceptions.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0700-0799\/0713\/Sections\/0713.13.html\", \"cite\": \"Fla. Stat. \u00a7 713.13\", \"heading\": \"Notice of commencement.\", \"support\": \"Unless otherwise provided in the notice of commencement or a new or amended notice of commencement, a notice of commencement is not effectual in law or equity against a conveyance, transfer, or mortgage of or lien on the real property described in the notice, or against creditors or subsequent purchasers for a valuable consideration, after 1 year after the date of recording the notice of commencement.\", \"verdict\": \"supported\", \"law_text\": \"\u2026 (6) Unless otherwise provided in the notice of commencement or a new or amended notice of commencement, a notice of commencement is not effectual in law or equity against a conveyance, transfer, or mortgage of or lien on the real property described in the notice, or against creditors or subsequent purchasers for a valuable consideration, after 1 year after the date of recording the notice of commencement. (7) A lender must, prior to the disbursement of any construction funds to the contractor, record the notice of commencement in the clerk\u2019s office as required by this section; \u2026\", \"sentence\": \"The notice expires one year after recording unless a different date is set.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.103.html\", \"cite\": \"Fla. Stat. \u00a7 489.103\", \"heading\": \"Exemptions.\", \"support\": \"Owners of property when acting as their own contractor and providing direct, onsite supervision themselves of all work not performed by licensed contractors:\", \"verdict\": \"supported\", \"law_text\": \"\u2026 However, this subsection does not exempt in-ground spas and swimming pools that involve excavation, plumbing, chemicals, or wiring of any appliance without a factory-installed electrical cord and plug. This subsection does not limit the exemptions provided in subsection (7). (7)(a) Owners of property when acting as their own contractor and providing direct, onsite supervision themselves of all work not performed by licensed contractors:1. \u2026\", \"sentence\": \"Florida law sets strict conditions for owners who act as their own contractor.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.103.html\", \"also\": [{\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.103.html\", \"cite\": \"Fla. Stat. \u00a7 489.103\", \"heading\": \"Exemptions.\", \"support\": \"The owner may not delegate the owner\u2019s responsibility to directly supervise all work to any other person\", \"law_text\": \"\u2026 An owner who qualifies for the exemption under this subparagraph is not required to occupy the dwelling or unit for at least 1 year after the completion of the project. (b) This subsection does not exempt any person who is employed by or has a contract with such owner and who acts in the capacity of a contractor. The owner may not delegate the owner\u2019s responsibility to directly supervise all work to any other person unless that person is registered or certified under this part and the work being performed is within the scope of that person\u2019s license. For the purposes of this subsection, the term \u201cowners of property\u201d includes the owner of a mobile home situated on a leased lot. \u2026\"}], \"cite\": \"Fla. Stat. \u00a7 489.103\", \"heading\": \"Exemptions.\", \"support\": \"an owner must personally appear and sign the building permit application\", \"verdict\": \"supported\", \"law_text\": \"\u2026 For the purposes of this subsection, the term \u201cowners of property\u201d includes the owner of a mobile home situated on a leased lot. (c) To qualify for exemption under this subsection, an owner must personally appear and sign the building permit application and must satisfy local permitting agency requirements, if any, proving that the owner has a complete understanding of the owner\u2019s obligations under the law as specified in the disclosure statement in this section. However, for purposes of implementing a \u201cUnited States Department of Energy SunShot Initiative: \u2026\", \"sentence\": \"The owner must personally sign the permit application and supervise the work.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.128.html\", \"cite\": \"Fla. Stat. \u00a7 489.128\", \"heading\": \"Contracts entered into by unlicensed contractors unenforceable.\", \"support\": \"contracts entered into on or after October 1, 1990, by an unlicensed contractor shall be unenforceable in law or in equity by the unlicensed contractor.\", \"verdict\": \"supported\", \"law_text\": \"(1) As a matter of public policy, contracts entered into on or after October 1, 1990, by an unlicensed contractor shall be unenforceable in law or in equity by the unlicensed contractor.(a) For purposes of this section, an individual is unlicensed if the individual does not have a license required by this part concerning the scope of the work to be performed under the contract. \u2026\", \"sentence\": \"Florida law also says contracts made by an unlicensed contractor cannot be enforced by that contractor.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.126.html\", \"cite\": \"Fla. Stat. \u00a7 489.126\", \"heading\": \"Moneys received by contractors.\", \"support\": \"A contractor who receives, as initial payment, money totaling more than 10 percent of the contract price for repair, restoration, improvement, or construction to residential real property must:1. Apply for permits necessary to do work within 30 days after the date payment is made\", \"verdict\": \"supported\", \"law_text\": \"\u2026 489.105(3), and any person performing or contracting or promising to perform work described therein, without regard to the licensure of the person. (2)(a) A contractor who receives, as initial payment, money totaling more than 10 percent of the contract price for repair, restoration, improvement, or construction to residential real property must:1. Apply for permits necessary to do work within 30 days after the date payment is made, except where the work does not require a permit under the applicable codes and ordinances, and 2. \u2026\", \"sentence\": \"Under Florida law, a contractor who receives an initial payment above 10 percent of the contract price must apply for permits within 30 days.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.126.html\", \"cite\": \"Fla. Stat. \u00a7 489.126\", \"heading\": \"Moneys received by contractors.\", \"support\": \"Start the work within 90 days after the date all necessary permits for work, if any, are issued, unless the contractor has just cause for failing to apply for the necessary permits, starting the work, or refunding the payment, or unless the person who made the payment agreed, in writing, to a longer period to apply for the necessary permits or start the work or to longer periods for both.\", \"verdict\": \"supported\", \"law_text\": \"\u2026 Apply for permits necessary to do work within 30 days after the date payment is made, except where the work does not require a permit under the applicable codes and ordinances, and 2. Start the work within 90 days after the date all necessary permits for work, if any, are issued, unless the contractor has just cause for failing to apply for the necessary permits, starting the work, or refunding the payment, or unless the person who made the payment agreed, in writing, to a longer period to apply for the necessary permits or start the work or to longer periods for both. (b)1. \u2026\", \"sentence\": \"The contractor must start work within 90 days after permits are issued, unless there is just cause or the owner agrees in writing to more time.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0700-0799\/0713\/Sections\/0713.015.html\", \"cite\": \"Fla. Stat. \u00a7 713.015\", \"heading\": \"Mandatory provisions for direct contracts.\", \"support\": \"Any direct contract greater than $2,500 between an owner and a contractor, related to improvements to real property consisting of single or multiple family dwellings up to and including four units, must contain the following notice provision\", \"verdict\": \"supported\", \"law_text\": \"(1) Any direct contract greater than $2,500 between an owner and a contractor, related to improvements to real property consisting of single or multiple family dwellings up to and including four units, must contain the following notice provision printed in no less than 12-point, capitalized, boldfaced type on the front page of the contract or on a separate page, signed by the owner and dated:ACCORDING TO FLORIDA\u2019S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROV \u2026\", \"sentence\": \"For a direct owner-contractor contract over $2,500, Florida law requires a construction lien notice in the contract.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0500-0599\/0553\/Sections\/0553.79.html\", \"cite\": \"Fla. Stat. \u00a7 553.79\", \"heading\": \"Permits; applications; issuance; inspections.\", \"support\": \"it shall be unlawful for any person, firm, corporation, or governmental entity to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency\", \"verdict\": \"supported\", \"law_text\": \"(1)(a) Unless otherwise provided by law, after the effective date of the Florida Building Code adopted as herein provided, it shall be unlawful for any person, firm, corporation, or governmental entity to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency or from such persons as may, by appropriate resolution or regulation of the authorized state or local enforcing agency, be delegated authority to issue such permits, upon the payment of such reasonable fees adopted by the enforcing agency. \u2026\", \"sentence\": \"Usually yes, when the work changes electrical, plumbing, or structure.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0700-0799\/0713\/Sections\/0713.13.html\", \"cite\": \"Fla. Stat. \u00a7 713.13\", \"heading\": \"Notice of commencement.\", \"support\": \"Notice of commencement\", \"verdict\": \"supported\", \"law_text\": \"(1)(a) Except for an improvement that is exempt under s. 713.02(5), an owner or the owner\u2019s authorized agent before actually commencing to improve any real property, or recommencing completion of any improvement after default or abandonment, whether or not a project has a payment bond complying with s. 713.23, shall record a notice of commencement in the clerk\u2019s office and post either a certified copy thereof or a notarized statement that the notice of commencement has been filed for recording along with a copy thereof. The notice of commencement must contain all of the following information:1. A description sufficient for identification of the real property to be improved. \u2026\", \"sentence\": \"See Fla. Stat. \u00a7 713.13.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.103.html\", \"cite\": \"Fla. Stat. \u00a7 489.103\", \"heading\": \"Exemptions.\", \"support\": \"Exemptions\", \"verdict\": \"supported\", \"law_text\": \"This part does not apply to:(1) Contractors in work on bridges, roads, streets, highways, or railroads, and services incidental thereto. The board, in agreement with the Department of Transportation, shall, by rule, define \u201cservices incidental thereto\u201d for the purposes of this subsection only. \u2026\", \"sentence\": \"See Fla. Stat. \u00a7 489.103.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0500-0599\/0553\/Sections\/0553.79.html\", \"cite\": \"Fla. Stat. \u00a7 553.79\", \"heading\": \"Permits; applications; issuance; inspections.\", \"support\": \"Unless otherwise provided by law, after the effective date of the Florida Building Code adopted as herein provided, it shall be unlawful for any person, firm, corporation, or governmental entity to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency\", \"verdict\": \"supported\", \"law_text\": \"(1)(a) Unless otherwise provided by law, after the effective date of the Florida Building Code adopted as herein provided, it shall be unlawful for any person, firm, corporation, or governmental entity to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency or from such persons as may, by appropriate resolution or regulation of the authorized state or local enforcing agency, be delegated authority to issue such permits, upon the payment of such reasonable fees adopted by \u2026\", \"sentence\": \"Under Florida law, it is generally unlawful to construct, erect, alter, modify, repair, or demolish a building in this state without first obtaining a permit from the appropriate enforcing agency, unless otherwise provided by law.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.128.html\", \"cite\": \"Fla. Stat. \u00a7 489.128\", \"heading\": \"Contracts entered into by unlicensed contractors unenforceable.\", \"support\": \"As a matter of public policy, contracts entered into on or after October 1, 1990, by an unlicensed contractor shall be unenforceable in law or in equity by the unlicensed contractor.\", \"verdict\": \"supported\", \"law_text\": \"(1) As a matter of public policy, contracts entered into on or after October 1, 1990, by an unlicensed contractor shall be unenforceable in law or in equity by the unlicensed contractor.(a) For purposes of this section, an individual is unlicensed if the individual does not have a license required by this part concerning the scope of the work to be performed under the contract. \u2026\", \"sentence\": \"Under Florida law, as a matter of public policy, contracts entered into on or after October 1, 1990, by an unlicensed contractor are unenforceable in law or in equity by that unlicensed contractor.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0400-0499\/0489\/Sections\/0489.126.html\", \"cite\": \"Fla. Stat. \u00a7 489.126\", \"heading\": \"Moneys received by contractors.\", \"support\": \"A contractor who receives, as initial payment, money totaling more than 10 percent of the contract price for repair, restoration, improvement, or construction to residential real property must:1. Apply for permits necessary to do work within 30 days after the date payment is made, except where the work does not require a permit under the applicable codes and ordinances, and 2. Start the work within 90 days after the date all necessary permits for work, if any, are issued,\", \"verdict\": \"supported\", \"law_text\": \"\u2026 489.105(3), and any person performing or contracting or promising to perform work described therein, without regard to the licensure of the person. (2)(a) A contractor who receives, as initial payment, money totaling more than 10 percent of the contract price for repair, restoration, improvement, or construction to residential real property must:1. Apply for permits necessary to do work within 30 days after the date payment is made, except where the work does not require a permit under the applicable codes and ordinances, and 2. Start the work within 90 days after the date all necessary permits for work, if any, are issued, unless the contractor has just cause for failing to apply for the necessary permits, starting the work, or refunding the payment, or unless the person who made t \u2026\", \"sentence\": \"Under Florida law, a contractor who receives initial payment of more than 10 percent of the contract price for residential repair, restoration, improvement, or construction must apply for necessary permits within 30 days after that payment, and start the work within 90 days after the permits are issued, subject to the exceptions stated in the statute.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0700-0799\/0713\/Sections\/0713.015.html\", \"cite\": \"Fla. Stat. \u00a7 713.015\", \"heading\": \"Mandatory provisions for direct contracts.\", \"support\": \"Any direct contract greater than $2,500 between an owner and a contractor, related to improvements to real property consisting of single or multiple family dwellings up to and including four units, must contain the following notice provision printed in no less than 12-point, capitalized, boldfaced type on the front page of the contract or on a separate page, signed by the owner and dated:\", \"verdict\": \"supported\", \"law_text\": \"(1) Any direct contract greater than $2,500 between an owner and a contractor, related to improvements to real property consisting of single or multiple family dwellings up to and including four units, must contain the following notice provision printed in no less than 12-point, capitalized, boldfaced type on the front page of the contract or on a separate page, signed by the owner and dated:ACCORDING TO FLORIDA\u2019S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE \u2026\", \"sentence\": \"Under Florida law, a direct contract greater than $2,500 between an owner and a contractor for improvements to a single or multiple family dwelling of up to four units must contain a construction lien notice printed in no less than 12-point, capitalized, boldfaced type, signed by the owner and dated.\"}, {\"url\": \"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&URL=0500-0599\/0501\/Sections\/0501.025.html\", \"cite\": \"Fla. Stat. \u00a7 501.025\", \"heading\": \"Home solicitation sale; buyer\u2019s right to cancel.\", \"support\": \"the buyer has the right to cancel a home solicitation sale until midnight of the third business day after the day on which the buyer signs an agreement or offer to purchase. Cancellation is evidenced by the buyer giving written notice of cancellation in person, by telegram, or by mail to the seller at the address stated in the agreement or offer to purchase.\", \"verdict\": \"supported\", \"law_text\": \"In addition to any other right to revoke an offer, the buyer has the right to cancel a home solicitation sale until midnight of the third business day after the day on which the buyer signs an agreement or offer to purchase. Cancellation is evidenced by the buyer giving written notice of cancellation in person, by telegram, or by mail to the seller at the address stated in the agreement or offer to purchase. The written notice of cancellation given by mail shall be effective upon postmarking. \u2026\", \"sentence\": \"Under Florida law, a buyer may cancel a home solicitation sale until midnight of the third business day after the day the buyer signs the agreement or offer to purchase, by giving written notice of cancellation to the seller at the address stated in that agreement.\"}, {\"url\": \"https:\/\/www.ecfr.gov\/on\/2026-10-06\/title-16\/section-429.1\", \"why\": \"The figure(s) 16 are not in 16 C.F.R. \u00a7 429.1, which says: \\\"You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date.\\\".\", \"cite\": \"16 C.F.R. \u00a7 429.1\", \"heading\": \"The Rule.\", \"support\": \"You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date.\", \"verdict\": \"unsupported\", \"law_text\": \"\u2026 Notice of Cancellation [enter date of transaction] (Date) You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within TEN BUSINESS DAYS following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be cancelled. \u2026\", \"sentence\": \"The federal Cooling-Off Rule gives buyers three business days to cancel certain sales made away from a seller's place of business, under 16 CFR 429.1.\"}], \"languages\": [{\"code\": \"en\", \"post_id\": 631}, {\"code\": \"es\", \"post_id\": 632}]}","chg_sendback":"","chg_canonical":"","chg_lang":"","chg_hreflang":"[]","chg_jsonld":"[{\"@context\": \"https:\/\/schema.org\", \"speakable\": {\"@type\": \"SpeakableSpecification\", \"cssSelector\": [\"article > p:first-of-type\", \".wp-block-details p\", \"article > h1\"]}, \"author\": {\"@type\": \"Person\", \"name\": \"Jonathan Rodriguez\", \"url\": \"https:\/\/www.linkedin.com\/in\/jonathan-rodriguez-09216416\/\", \"jobTitle\": \"Certified General Contractor\", \"sameAs\": [\"https:\/\/www.myfloridalicense.com\/portalsearches\/VerifyLicensee\/LicenseDetail?ID=81DE1224EF6719C46077765F1D032FEB\", \"https:\/\/www.aspsuperhome.com\/author\"]}, \"publisher\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/aspsuperhome.com\/guides\/#organization\", \"name\": \"ASP Superhome\", \"url\": \"https:\/\/aspsuperhome.com\/\"}, \"reviewedBy\": {\"@type\": \"Person\", \"name\": \"Yesenia Rodriguez\", \"jobTitle\": \"Co-Founder\"}, \"inLanguage\": \"en\", \"@id\": \"https:\/\/aspsuperhome.com\/kitchen-remodeling-boca-raton\/#faq\", \"about\": {\"@id\": \"https:\/\/aspsuperhome.com\/kitchen-remodeling-boca-raton\/#service\"}, \"@type\": [\"Article\", \"FAQPage\"], \"image\": \"https:\/\/aspsuperhome.com\/guides\/wp-content\/uploads\/2026\/10\/homeowner-inspecting-a-newly-remodeled-kitchen-with-new-cabi-photo.jpg\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Do I need a permit for kitchen remodeling in Boca Raton?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Usually yes, when the work changes electrical, plumbing, or structure. The local building office sets the process.\"}}, {\"@type\": \"Question\", \"name\": \"Can I cancel a kitchen remodel contract after I sign?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The federal Cooling-Off Rule gives buyers three business days to cancel certain sales made away from a seller\u2019s place of business, under 16 CFR 429.1. Under Florida law, a buyer may cancel a home solicitation sale until midnight of the third business day after the day the buyer signs the agreement or offer to purchase, by giving written notice of cancellation to the seller at the address stated in that agreement.\"}}, {\"@type\": \"Question\", \"name\": \"How long does a kitchen remodel take in Boca Raton?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The timeline depends on scope, permits, and materials. A written estimate and schedule give you the clearest picture.\"}}]}, {\"@id\": \"https:\/\/aspsuperhome.com\/kitchen-remodeling-boca-raton\/#service\", \"name\": \"Kitchen Remodeling in Boca Raton\", \"@type\": \"Service\", \"about\": [\"kitchen remodeling\", \"kitchen cabinets\", \"kitchen countertops\", \"kitchen renovation\", \"kitchen remodel permits Boca Raton\"], \"provider\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/aspsuperhome.com\/guides\/#organization\", \"name\": \"ASP Superhome\", \"url\": \"https:\/\/aspsuperhome.com\/\"}, \"areaServed\": [{\"name\": \"Boca Raton\", \"@type\": \"City\", \"containedInPlace\": {\"name\": \"Florida\", \"@type\": \"State\"}}, {\"name\": \"Palm Beach County, Florida\", \"@type\": \"AdministrativeArea\"}], \"description\": \"Planning guide and service page for kitchen remodeling in Boca Raton, Florida. Covers signs that cabinets need replacement, South Florida humidity and wear, budget factors for a kitchen remodel, cabinet and countertop choices, layout considerations, permits and HOA or condominium approvals in Palm Beach County, and the steps from a free first consultation through installation.\", \"serviceType\": \"Kitchen remodeling\", \"availableChannel\": {\"@type\": \"ServiceChannel\", \"serviceType\": \"Free first consultation and in-home measurement\"}, \"inLanguage\": \"en\", \"@context\": \"https:\/\/schema.org\"}, {\"@context\": \"https:\/\/schema.org\", \"@type\": \"BreadcrumbList\", \"itemListElement\": [{\"@type\": \"ListItem\", \"position\": 1, \"name\": \"Home\", \"item\": \"https:\/\/aspsuperhome.com\/guides\/\"}, {\"@type\": \"ListItem\", \"position\": 2, \"name\": \"Kitchen Remodeling\", \"item\": \"https:\/\/aspsuperhome.com\/guides\/kitchen-remodeling\/\"}, {\"@type\": \"ListItem\", \"position\": 3, \"name\": \"Kitchen Remodeling Boca Raton | ASP Superhome\", \"item\": \"https:\/\/aspsuperhome.com\/guides\/kitchen-remodeling\/boca-raton\/\"}]}]","chg_meta_description":"Planning a kitchen remodel in Boca Raton? Learn the cabinet warning signs, permit rules, and budget factors, then request a quote from ASP Superhome.","footnotes":""},"class_list":["post-631","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/pages\/631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/comments?post=631"}],"version-history":[{"count":5,"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/pages\/631\/revisions"}],"predecessor-version":[{"id":6830,"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/pages\/631\/revisions\/6830"}],"up":[{"embeddable":true,"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/pages\/117"}],"wp:attachment":[{"href":"https:\/\/aspsuperhome.com\/guides\/wp-json\/wp\/v2\/media?parent=631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}